Thursday, 20 November 2014

Task 7: Feedback on rough cut of our music video



We presented our rough cut of our music video to our class and recieved some positive feedback and some constructive criticism which was very useful as it will help us make any changes that the audience will want to see change:

Some of the comments were:

- More interaction between the couple would be better
- Pictures all over the screen would be a good idea
- Clips need to be shorter
- Images are on for too long - can put more or speed up the duration of each
- Lip synching/talking is not clear - needs to be cut into
- Artist looks confused in the mirror scene - needs fixing,

Task 8: Feedback on digipak pitch/Print products



We have pitched our initial ideas for our print products and have gained some useful audience comment on what they liked and some suggestions before we get on with them:

- Idea of female being the shadow is good
- Shadow of the female shouldn't be there as it will take the focus away from him as an artist
- The park may be a good location from the music video to use for the insert
- A use of the artist's image from the music video in the park with a different background that can be created on photoshop may be a good idea.

We have taken some comments into consideration and will have only the artist featured on all of the print products.

Task 8: Research and Planning: Case studies for print products

Task 7: Miss You So by Frank Ocean (Final Version)

Saturday, 15 November 2014

Task 7: Editing work in progress


We are working our way through editing the clips and to put them together for our music video. We are becoming confident in using Final Cut Pro independently as a group

Saturday, 25 October 2014

Task 6: Shooting at Hyde Park day 3





Checking the focus and lighting

We changed our park location of Hollow Ponds to Hyde Park as the setting was easier to use and it wasn't as busy. We also think the location is better and there is more space that we were allowed to use.

We have completed all of our shoots and are ready to select the good shots and start working on them for the editing task.

Wednesday, 15 October 2014

Task 6: House shooting day 2



Couple's break up scene


Watching over the clips

For our second shooting we took mainly the house scenes and have achieved some good shots that we have reviewed and are happy with. We don't need to re shoot these scenes and so have worked up to our individual roles as a team.

Friday, 10 October 2014

Task 6: Music video shooting - Day 1 practice

Today our first shooting took place at Zeynep's house and a park on the same street as the house. We considered these shoots as our practice shoots as we wanted to test out our locations with the camera and see if anything needs to improved for the actual filming and what kind of things are required that we need to consider. 

We realised that these practice shoots helped us, as our actors were more comfortable by the end of it, and watching back we realised that we need to take more care with how focused the camera is when shooting and how the lighting should be. 


Actors in the meeting scene


Actress Maryam's make up done by Zeynep




Group behind the camera watching the scene

Thursday, 9 October 2014

Task 6: Timetable and Scheduling

Sunday 19th October – meet up (Walthamstow central) at 12.00
  • Walthamstow Street
  •  Zeynep’s house
  •  Hollow Pond

Friday 31th October – Meet up (Walthamstow central) 10.00
  • If we do not finish the scene where they meet at Walthamstow. We will complete it then.
  • Café – Sunset

Saturday 1st November - meet up (Mile End) 10.00
  • Canary Wharf

Sunday 2nd November - meet up 10.00
  • Central London (possibilities)
  • Canary Wharf

Wednesday 5th November - meet up 2.30
  • Photo Studio

Saturday 8th November - meet up 10.00
  • Central London (possibility to re-shoot)

Sunday 9th November - meet up 10.00
  • Possible re-shoots 

Monday, 6 October 2014

Task 5 Pre Production: Call sheets




Task 5 Pre Production: Storyboards














7 missing








Task 5 Pre Production: Recces (Location)



Above is the college TV studio. Here we will shoot a lot of the lip synching and any narrative based performance that we may shoot. We will also have the scenes of the couple here.



Above is the location of Hollow Ponds. We will shoot the meeting scene here and the ending scene where they come across each other once again.







Above is Canary Wharf. We will shoot the couple's time together here around the area.



This is the college photography studio. We may shoot some parts here if the TV studio is not available.


Task 5 Pre Production: Release form



E-mail to Waltham Forest asking for permission to shoot in  Hollow Ponds for coursework purposes

Task 5 Pre Production: Risk assessment